Field School
The methods behind the data, taught properly. Free.
USGS methods are excellent and buried in PDFs. Field School takes them out, one procedure at a time, with new illustrations, the reasons behind every step, and the errors a senior technician has watched people make for twelve years. Each chapter sits beside the CEDAR stage that catches what the method prevents.
Free to read, print and teach from · CC BY 4.0 · methods: USGS Techniques and Methods 1-D3 and the National Field Manual · written by a twelve-year USGS hydrologic technician
The curriculum, in the order the water goes through it
Each module sits beside the stage of CEDAR that catches what the method prevents. No chapter is published yet; the first is written and in review, and the list says so.
-
Module 1
Before the water
CEDAR stage: ImportGear, safety, calibration, and the launch settings that decide whether a file can be read at all.
- Calibration: teaching the sensor the right answer in writing
- Launching a logger: clock, interval, roles, and the first reading in writing
-
Module 2
In the water
CEDAR stage: Field readingSiting, deployment hardware, and the field reading as a measurement in its own right.
- Siting a continuous monitor in writing
- The field reading: letting the sensor settle in writing
-
Module 3
The service visit
CEDAR stage: CorrectionsThe visit that makes a record correctable: four readings, the cleaning, the standard check, and the fouling and drift corrections of USGS TM 1-D3.
- The service visit: the four readings that make a record correctable in review: numbers being verified against TM 1-D3
- Drift: calibration checks and when to recalibrate in writing
-
Module 4
Reading the record
CEDAR stage: QCWhat the automatic checks see, what a real event looks like, and the judgement the algorithms cannot make.
- Spikes, flatlines, and gaps: what the checks catch and why in writing
- Was it real? Context before the flag in writing
-
Module 5
Rating the record
CEDAR stage: ExportRecord ratings, the review, and the file that leaves your hands.
- Rating a record: excellent, good, fair, poor in writing
What Field School is
Every chapter is a procedure a working hydrologic technician would recognise, written for someone doing it for the first time without a mentor standing beside them. The steps say what to do and why. The cautions are the mistakes that actually happen, each one tied to how it shows up in the data afterwards and to the stage of CEDAR, DANalytics’ continuous-data software, that is built to catch or correct it. Where CEDAR does not yet catch something, the chapter says so in as many words. The illustrations are drawn for the chapter, not borrowed.
The methods are the U.S. Geological Survey’s, above all Guidelines and standard procedures for continuous water-quality monitors (Techniques and Methods 1-D3) and the National Field Manual. Those reports are public domain and are the authority; Field School is a way of reading them, written by someone who spent twelve years applying them. It is independent of the USGS and of every agency it cites, and none of them has reviewed or endorsed it. Where a chapter states a number, it says where the number comes from, and a chapter whose numbers have not yet been checked against the report stays a draft.
Field School is free to read, print, and teach from, under a Creative Commons Attribution 4.0 licence. If you want the person who wrote it in the field with your crew, that is the field training service.